| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 19(2); 1991 > Article
Journal of Korean Society for Quality Management 1991;19(2): 125-.
차별 벌과금과 공통납기를 고려한 흐름작업 일정 계획에 관한 연구
이정환, 노인규
동의대 산업공학과
A study on Flow Shop Scheduling Problems with Different Weighted Penalties and a Common Due Date
Jeong-Hwan Lee, In-Gyu No
ABSTRACT
This paper is concerned with the flow shop scheduling problems considering different weighted penalty costs for earliness and lateness, and a common due date. The objective of the paper is to develop an efficient heuristic scheduling algorithm for minimizing total penalty costs and for determining the optimal common due date. The positional weight index and, the product sum method are used. A numerical example is given for illustrating the proposed algorithm.
TOOLS
PDF Links  PDF Links
Full text via DOI  Full text via DOI
Download Citation  Download Citation
Share:      
METRICS
1,083
View
2
Download
Related article
A Parallel Processors Scheduling Problems with a Common Due Date  1990 ;18(2)
Editorial Office
13F, 145, Gasan digital 1-ro, Geumcheon-gu, Seoul 08506, Korea
TEL: +82-2-2624-0357   FAX: +82-2-2624-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next