| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 11(2); 1983 > Article
Journal of Korean Society for Quality Management 1983;11(2): 37-.
선별형(選別型) 검사(檢査)의 경제성(經濟性)에 관한 연구(硏究)
조충호1, 김성인2
1고려대학교 대학원
2고려대학교 공과대학 산업공학과
The Cost Breakeven Points in Rectifying Inspection Plans
Chung-Ho Jo1, Seong-In Kim2
1
2
ABSTRACT
Nine different rectification inspection policies are considered. For each variation, the cost breakeven points between acceptance without inspection, 100% inspection and sampling inspection are evaluated in both cases where process average is constant and varies as a beta distribution.
TOOLS
PDF Links  PDF Links
Full text via DOI  Full text via DOI
Download Citation  Download Citation
Share:      
METRICS
1,215
View
9
Download
Related articles
An Algorithm for Determining Double Rectifying Inspection Plans  1996 ;24(4)
The Optimal Design Rectifying Inspection Plan with Application to Linear Cost Model  1995 ;23(4)
Editorial Office
13F, 145, Gasan digital 1-ro, Geumcheon-gu, Seoul 08506, Korea
TEL: +82-2-2624-0357   FAX: +82-2-2624-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next