| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 24(1); 1996 > Article
Journal of Korean Society for Quality Management 1996;24(1): 20-.
다단계 생산공정에서의 검사지점 할당 문제에 관한 연구
이성기, 윤덕균
한양대학교 산업공학과
The Allocation of Inspection Stations in Multi-Stage Production Systems with 0-1 Integer Programming
Sung-Gi Lee, Deok-Kyun Yun
Dept. of Industrial Engineering, Hanyang University
ABSTRACT
A pure zero-one integer program is formulated for determining where to assign the inspection stations in a multi-stage production system. The objective fuction is formulated to minimize the overall inspection costs. One of the major characteristics of this system is that an assigned inspection station is to inspect only the items produced in previous manufacturing stages. Each inspection station can be assigned to any possible inspection stage between two manufacturing stages. Error-free and screening inspection policy is assumed in this system and the defective items found in any inspection station will be reworked at once. The integer programming model presented in this paper has the advantages in the ease of modeling and modifiing as compared with the existing dymanamic programming methods. The solutions of the model can be easily obtained by the commercially available softwares like LINDO and GAMS.
TOOLS
PDF Links  PDF Links
Full text via DOI  Full text via DOI
Download Citation  Download Citation
Share:      
METRICS
1,204
View
0
Download
Related article
The Allocation of Inspection Efforts Using a Knowledge Based System  1990 ;18(2)
Editorial Office
13F, 145, Gasan digital 1-ro, Geumcheon-gu, Seoul 08506, Korea
TEL: +82-2-2624-0357   FAX: +82-2-2624-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next