| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 21(2); 1993 > Article
Journal of Korean Society for Quality Management 1993;21(2): 224-.
중복설계와 하청을 고려한 셀 및 부품군 형성 절차
문치웅, 김효남, 이상용
건국대학교 산업공학과
A Machine Cell and Part Family Formation Procedure in Considering the Duplication and Subcontracting
Chi-Ung Mun, Hyo-Nam Kim, Sang-Yong Lee
ABSTRACT
This paper propose a procedure to form the cell and part family using both of similarity coefficient method and mathematical programming in order to slove the exceptional part and bottleneck machine problems. In the procedure proposed by this paper, the machine duplication and subcontracting are considered to slove the bottleneck machine and intercellular moving part problems An example is given to show how this procedure works.
TOOLS
PDF Links  PDF Links
Full text via DOI  Full text via DOI
Download Citation  Download Citation
Share:      
METRICS
1,242
View
0
Download
Related article
Editorial Office
1806, 310, Gangnam-daero, Gangnam-gu, Seoul, 06253, Korea
TEL: +82-2-563-0357   FAX: +82-2-563-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next