| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 17(2); 1989 > Article
Journal of Korean Society for Quality Management 1989;17(2): 47-.
불량률(不良率) 감소(減少)를 위한 공정개선대안(工程改善對案) 결정(決定)에 관한 연구(硏究)
이도경1, 조진형2
1한양대학교 산업공학과
2금오공대 산업공학과
A Study on the Decision For the Process Improvement Alternatives to Reduce the Fraction Defective
Do-Gyeong Lee1, Jin-Hyeong Jo2
1
2
ABSTRACT
This study is concerned with the reduction of fraction defective for quality improvement model in manufacturing system. For the methodology, a heuristic method for the selection of alternatives of process improvement is introduced for quality improvement and cost problem subject to cost constraints. This study suggests a model for selecting fraction defective reduction alternatives in multi-stage manufacturing system and a numerical example is presented.
Editorial Office
13F, 145, Gasan digital 1-ro, Geumcheon-gu, Seoul 08506, Korea
TEL: +82-2-2624-0357   FAX: +82-2-2624-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next