| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 14(2); 1986 > Article
Journal of Korean Society for Quality Management 1986;14(2): 40-.
프로젝트견적(見積)과 한계분석(限界分析)
박상민
인천대학 산업공학과
Project Estimating and Marginal Analysis
Sang-Min Park
ABSTRACT
The decision maker has the job of torecasting capital investments and operating expenses to aid the decision making in choosing and evaluating present and future alternatives. The estimating function eventually analysis, evaluates and choose the alternatives. The analysis stemmed originally from a preliminary design of some sort, and eventually plans are started to investigate investment possibilites. This study provide the descounted cash flow and the present worth method. Despite any choice of an analytical method, there remains the problem of predicting certain future events. Therefore, these models dealing with optimum plant sizing, equipment replacement, and lease or buy will be discussed.
TOOLS
PDF Links  PDF Links
Full text via DOI  Full text via DOI
Download Citation  Download Citation
Share:      
METRICS
1,066
View
0
Download
Related articles
Parameter Estimation From Singly Censored Normal Sample  1987 ;15(2)
Prioritizing quality attributes using I-S Gap analysis  2015 June;43(2)
Editorial Office
13F, 145, Gasan digital 1-ro, Geumcheon-gu, Seoul 08506, Korea
TEL: +82-2-2624-0357   FAX: +82-2-2624-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next