| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 21(2); 1993 > Article
Journal of Korean Society for Quality Management 1993;21(2): 102-.
비용을 극소화하는 최적 번인시간 결정
이상용1, 박해근2
1건국대학교 산업공학과
2안양전문대학 품질관리과
Cost Optimizing Burn-in Time Determination
Sang-Yong Lee1, Hae-Geun Park2
1
2
ABSTRACT
The purpose of burn-in is to eliminate the early failures of the products before they are delivered for customer use. Therefore burn-in should he continued until one is reasonally sure that all the weak items have failed, thus leaving the remaining items in a healthy state of reliability. From this point of view, burn-in time dependent costs such as a cost per product per burn-in time, and cost of repair of the product per failure occurred during burn-in time will he increased. Conversely, the cost of field repair of the product per failure occurred during the guarantee period will be decreased since the early failure of the product is fully eliminated during burn-in. Hence, this paper intend to determine optimal burn-in time which minimize the total of above costs associated with burn-in.
TOOLS
PDF Links  PDF Links
Full text via DOI  Full text via DOI
Download Citation  Download Citation
Share:      
METRICS
1,259
View
1
Download
Related article
Editorial Office
1806, 310, Gangnam-daero, Gangnam-gu, Seoul, 06253, Korea
TEL: +82-2-563-0357   FAX: +82-2-563-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next