| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 17(2); 1989 > Article
Journal of Korean Society for Quality Management 1989;17(2): 121-.
준비시간이 작업순서에 영향을 받는 흐름작업에서의 휴리스틱 알고리즘
최성운1, 노인규2
1경원대학교 산업공학과
2한양대학교 산업공학과
A Development of Multi-Stage Sequence Dependent Flowshop Scheduling Heuristics
Seong-Un Choe1, In-Gyu No2
1
2
ABSTRACT
This paper is concerned with a development and evaluation of heuristics for the multi-stage sequence dependent flowshop sequencing. Eighteen heuristics, CAM1, CAM2, and etc., are proposed. The performance measure is a makespan which is to be minimized. The experiment for each algorithm is designed for a 4*3*3 factorial design with 360 observations. The experimental factors are PS(ratio of processing times to setup times), M(number of machines), N(number of jobs). The makespan of the proposed heuristics is compared with the optimal makespan obtained by the complete enumeration of schedules. This yardstick of comparison is called a relative error. The mean relative errors of the eighteen heuristics are from 2.048% to 8.717%. The computational results are analysed using SPSS. The experimental results show that the three factors are statistically significant at 5% level. The simulation for the large size problems is conducted to show having the similar computational results like the small size problems.
TOOLS
PDF Links  PDF Links
Full text via DOI  Full text via DOI
Download Citation  Download Citation
Share:      
METRICS
1,622
View
29
Download
Related article
A Development of Heuristic Algorithms for the Multi-stage Manufacturing Systems with Sequence Dependent Setup Times  1989 ;17(1)
Editorial Office
1806, 310, Gangnam-daero, Gangnam-gu, Seoul, 06253, Korea
TEL: +82-2-563-0357   FAX: +82-2-563-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next